ITM Power secures £46.5m government grant to build next-generation electrolyser line

ITM Power has confirmed that a £46.5 million grant from the Department for Energy Security and Net Zero has now been formally awarded.

The funding was first announced in April, alongside a £40 million equity investment from Great British Energy. Together, they underpin the manufacturing capability for ITM’s next-generation Chronos electrolyser stack.

- Advertisement -

Chronos, developed over more than two years, is expected to deliver a step change in both cost and energy efficiency as green hydrogen is scaled.

The Chronos line is planned for ITM’s existing Sheffield facilities, drawing on infrastructure and production know-how developed over the years on the Trident line. Co-locating the two lines lowers execution risk while still allowing a scalable, high-throughput platform.

The investment is geared towards 1 GW of annual production capacity, with bespoke automated equipment across catalyst-coated membrane production, electrode welding, specialist coatings and stack assembly, plus cleanroom infrastructure. In-house test systems and validation materials round out a plan aimed at a smooth ramp-up.

Dennis Schulz, CEO, said: “We are delighted that the DESNZ grant has now been formally awarded, enabling us to build our next-generation Chronos manufacturing line in Sheffield. Combined with the strategic equity investment from Great British Energy, this marks a pivotal step in establishing us at the centre of the UK’s hydrogen economy and firmly positions us as a natural partner for projects in the UK. Sheffield is recognised as the historic home of steelmaking. We will make it just as famous for hydrogen.”

Latest News

More Articles Like This